Investments BG
24th January 2016, 14:31
The park operates from 2010, the contract is for 25 years with CEZ, at a price of 699.11 lev without VAT MWh. Built on their own land. panels are 3 MB English – China and 2MB SEEG – China, inverters 1 MB-IDS Solar – Bulgaria 4MV and SMA – Germany .. At that price is paid for 8 years.
installed equipment:
- Yingli Solar 4320 set x 235W= 1 015 200 Wp poly / YL235P-29B/
- Yingli Solar 8976 set x 245 W= 2 199 120 Wp mono /YL245C-30B/
- GEES-SST 378 set x 240W = 90 270 Wp /240-60M/
- GEES- SST 7173 x 235 W = 1 685 655 Wp /235-60M/
Total installed 4 990 2345 Wp
Inverters – IDS SOLO 4×250 KW total: 1 МW
Inverters – SMA STP 15000 TL-10 -259 SET
Energy sold in 2014, excluding VAT, of € 2,000,000
Cost per month:
- Security – 2800 lev per month excluding VAT – € 1,432
- Accounting – 300 lev VAT – € 154
- 2 workers – electricians lev 1200, a total of 2,400 lev. – € 1,227
- Electricity Object 1000-1400 lev VAT – 551-716 евро
- 1 laborer – 600 lev – € 307
Fee for balancing energy – from 1.5 to 4% of the energy produced each month (CEZ balancing group is a park).
We have found additional remains of reactive energy.
– Insurance – 32 000 lev per year in four parts. – € 16,362
The remainder of the loan – 8.7 million €.
Plan to repay the loan – Principal + interest lev 3.4 million a year – € 1,739,000
Interest on year 7.5% plus 0.5% of the amount of credit management.
Option 1: Pay to: 17 million Euro and transfer it to you without credit!
Option 2: Pay to: € 8.3 million of the owner and the loan is transferred to your name! which is 8.7 million euros
installed equipment:
- Yingli Solar 4320 set x 235W= 1 015 200 Wp poly / YL235P-29B/
- Yingli Solar 8976 set x 245 W= 2 199 120 Wp mono /YL245C-30B/
- GEES-SST 378 set x 240W = 90 270 Wp /240-60M/
- GEES- SST 7173 x 235 W = 1 685 655 Wp /235-60M/
Total installed 4 990 2345 Wp
Inverters – IDS SOLO 4×250 KW total: 1 МW
Inverters – SMA STP 15000 TL-10 -259 SET
Energy sold in 2014, excluding VAT, of € 2,000,000
Cost per month:
- Security – 2800 lev per month excluding VAT – € 1,432
- Accounting – 300 lev VAT – € 154
- 2 workers – electricians lev 1200, a total of 2,400 lev. – € 1,227
- Electricity Object 1000-1400 lev VAT – 551-716 евро
- 1 laborer – 600 lev – € 307
Fee for balancing energy – from 1.5 to 4% of the energy produced each month (CEZ balancing group is a park).
We have found additional remains of reactive energy.
– Insurance – 32 000 lev per year in four parts. – € 16,362
The remainder of the loan – 8.7 million €.
Plan to repay the loan – Principal + interest lev 3.4 million a year – € 1,739,000
Interest on year 7.5% plus 0.5% of the amount of credit management.
Option 1: Pay to: 17 million Euro and transfer it to you without credit!
Option 2: Pay to: € 8.3 million of the owner and the loan is transferred to your name! which is 8.7 million euros